Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Working with lead alternatives
Working with lead alternatives
Building information modelling (BIM) introduction
This training standard is also known as: BIM Awareness. The purpose of this standard is to provide learners with an opportunity to explore the principles and practices of BIM within the built environment.
Leak detection methods for liquid roofing
Leak detection methods for liquid roofing
Batten and membrane installation
The purpose of this standard is to provide the candidate with the knowledge and skills to install battens and membrane for a new slate and/or tile roof.
Two pack polyurethanes and flexible polyesters
Two pack polyurethanes and flexible polyesters
Car parks: products and application methods
Car parks: products and application methods
Balconies, podiums and inverted roof systems
Balconies, podiums and inverted roof systems
Hot applied roof membranes: rubberised bitumen
Hot applied roof membranes: rubberised bitumen
Estimating for slating and tiling
Estimating for slating and tiling
Built-up wall cladding construction and specification
The purpose of this standard is to provide the candidate with knowledge of managing the built-up wall package, from concept to handover.
Curator - bottom
How did we do today? Give feedback