Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Repairing defective brick and block work
The purpose of training against this standard is to give candidates an overview of the different systems and requirements in place to control the quality of work and the handover process to the client.
Plain tiling introduction
Plain tiling introduction
Interlocking tiles introduction
Interlocking tiles introduction
Dry-fixed systems
Dry-fixed systems
Fixed gauge tiling
Fixed gauge tiling
Roof felt products and application
Roof felt products and application
Natural slating introduction
Natural slating introduction
Workmanship and quality
Workmanship and quality
Bonding, taping and positioning insulation board
Bonding, taping and positioning insulation board
Asbestos air monitoring and clearance procedures
Asbestos air monitoring and clearance procedures
Curator - bottom
How did we do today? Give feedback