Site Search
Search module
Curator - left
Curator - center
Fully-matching results
Forming of cavities and correct installation of ties
The purpose of training delivered against this standard is to provide candidates with the practical skill and knowledge to be able to safely and effectively construct a cavity, paying particular attention to the correct fixings of wall ties.
Plain tiling introduction
Plain tiling introduction
Liquid applied membranes introduction
Liquid applied membranes introduction
Plans of work and risk assessments for asbestos removal…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Interlocking tiling
Interlocking tiling
Rooflights, maintenance and waterproofing
Rooflights, maintenance and waterproofing
Ventilating pitched roofing
Ventilating pitched roofing
Interlocking tiles introduction
Interlocking tiles introduction
Fixed gauge tiling
Fixed gauge tiling
Personal and respiratory protective equipment for…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Curator - bottom
How did we do today? Give feedback