Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Batten and membrane installation
The purpose of this standard is to provide the candidate with the knowledge and skills to install battens and membrane for a new slate and/or tile roof.
Estimating for slating and tiling
Estimating for slating and tiling
Balconies, podiums and inverted roof systems
Balconies, podiums and inverted roof systems
Hot applied roof membranes: rubberised bitumen
Hot applied roof membranes: rubberised bitumen
Plans of work and risk assessments for asbestos removal…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Personal and respiratory protective equipment for…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Information sources and fixing specifications
Information sources and fixing specifications
Built-up wall cladding construction and specification
The purpose of this standard is to provide the candidate with knowledge of managing the built-up wall package, from concept to handover.
Guidelines for tiling
The purpose of this standard is to provide the candidate with the basic knowledge of to fix tiles.
Preparation and use of mortar
Preparation and use of mortar
Curator - bottom
How did we do today? Give feedback