Facebook Pixel
Skip to content

Search results

Your search for All resulted in 363 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

302.1 Installing, Maintaining and Removing Temporary Traffic Management on Rural and Urban Roads

This standard aims to provide employees working within the Highway Electrical Sector the underpinning knowledge required for the understanding and use of equipment for Safety at Street Works and Road Works, as appropriate to the scope of their work on site.

Access towers (hire industry)

The purpose of this standard is to provide the candidate with skills and knowledge needed to assemble access towers. Mobile towers, also known as scaffold towers or alloy towers are an integral part of the hire industry. These structures are a key item for working at height.

Acoustic Lay-in Grid Ceilings Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of metal ceiling components and acoustic plasterboards/ceiling tiles to maintain designed acoustic, working to construction and manufacturers drawings, construction principles. related products (e.g., metal ceiling tiles, plasterboard ceiling tiles, mineral/glass fibre ceiling tiles, fixings, sealants, components, etc.) required tools and equipment

Acoustic MF Ceiling Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of MF ceiling systems and acoustic plasterboards to maintain designed acoustic, performance. working to construction and manufacturers drawings, construction principles. related products (e.g., plasterboards, fixings, sealants, components, etc.) required tools and equipment

Advanced applying printed murals

The purpose of this course is to prepare the delegates for real world mural application. The advanced applying printed murals course covers more than just applying a mural on a flat wall. Complex surfaces, resolving problems with designs and handling obstacles are all covered in this advanced course.

Advanced Scaffold Inspection Training Scheme (ASITS)

This standard covers the training requirements for professional Scaffold Inspectors, Scaffolding Supervisors and Management and others who are responsible for statutory scaffold inspection for more complex structures.

Advanced Scaffolder

This standard covers the training requirements for a scaffolding operative to be able as a member of a team, to erect, alter and dismantle the scaffolds safely and in their correct sequence. The trained operative will also be suitably qualified to lead operations as a charge hand in a scaffold gang carrying out all types (Basic and Advanced) of scaffolding works. The completion of this course allows an operative to register and qualify for a NVQ/SVQ level three. This training standard was previously held under the occupational area Scaffolding.

Airless spray paint machine (GRACO)

The purpose of this standard is to provide the candidate with the knowledge and skills to safely set up and use an airless spray paint machine (Graco type) to install road markings using cold liquid type paints.

Application details in single ply roofing

The purpose of this standard is to provide the candidate with the knowledge for detailing of single ply roofing, where the roof changes geometry or shape, and where the roof meets another part of the building.

Applying Printed Murals

This standard is about applying printed murals to a wall area. It includes working with different types of murals and understanding their advantages and disadvantages. The standard also includes the required preparation of the wall area before applying the mural, the availability and suitability of different types of adhesive, Measuring, setting out and applying the mural to the wall.

How did we do today? Give feedback