Facebook Pixel
Skip to content

Search results

Your search for m resulted in 1384 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Resin bound installation

The purpose of this standard is to provide the delegate with the knowledge to support the following scope: methods for mixing and installing resin bound surfaces. use and maintain tools required. handling, storage and health and safety, preparation process for installation, common problems and how to avoid / resolve them, installation of a resin bound and bonded surface

Resin flooring and equipment introduction


Resin self smoothing systems


Respiratory protective equipment in construction

The purpose of training delivered against this standard is to provide delegates with an understanding of the law regarding the use of respiratory protective equipment (RPE) as a chosen control regime.

Retrofit for older and traditional buildings

This standard covers knowledge of factors that influence traditional pre-1919 buildings.

Retrofit insulation masterclass

The purpose of this standard is to provide the delegate with the knowledge to support the following: challenges of retrofit principles of retrofit installing insulation whole building approach

Rig based diamond drilling

This standard covers the training requirements for an operative to correctly and safely operate rig based diamond drilling equipment on the job.

Rig based diamond drilling - refresher

The purpose of training against this standard is to provide the candidates with the knowledge and understanding of carrying out rig based diamond drilling operations safely.

Ring sawing

This standard covers the training requirements for an operative in ring sawing activities.

Rising damp and its control

The purpose of this standard is to provide the delegate with the knowledge and skills to support the following: identifying rising damp, using moisture meters, controlling rising damp, interpreting information, setting up equipment, stepped drilling procedures, types of damp-proof treatments, the importance of re-plastering, safe disposal of waste

How did we do today? Give feedback