- Published
- In-situ flooring
- Assured
- £60 (Tier 1)
- GET3320
The purpose of this standard is to provide the delegate with the knowledge to support the following scope: methods for mixing and installing resin bound surfaces. use and maintain tools required. handling, storage and health and safety,
preparation process for installation, common problems and how to avoid / resolve them, installation of a resin bound and bonded surface
- Published
- Construction (common)
- Assured
- £60 (Tier 1)
- GET2820
The purpose of training delivered against this standard is to provide delegates with an understanding of the law regarding the use of respiratory protective equipment (RPE) as a chosen control regime.
- Published
- Heritage (common)
- Assured
- £60 (Tier 1)
- GET2179
This standard covers knowledge of factors that influence traditional pre-1919 buildings.
- Published
- Insulation and building treatments
- Assured
- £60 (Tier 1)
- GET2121
The purpose of this standard is to provide the delegate with the knowledge to support the following:
challenges of retrofit
principles of retrofit
installing insulation
whole building approach
- Published
- Drilling and sawing
- Recognised
- £140 (Tier 2)
- GET1588
This standard covers the training requirements for an operative to correctly and safely operate rig based diamond drilling equipment on the job.
- Published
- Drilling and sawing
- Recognised
- £70 (Tier 2 - refresher)
- GET2844
The purpose of training against this standard is to provide the candidates with
the knowledge and understanding of carrying out rig based diamond drilling
operations safely.
- Published
- Drilling and sawing
- Recognised
- £140 (Tier 2)
- GET2344
This standard covers the training requirements for an operative in ring sawing activities.
- Published
- Insulation and building treatments
- Assured
- £60 (Tier 1)
- GET3253
The purpose of this standard is to provide the delegate with the knowledge and skills to support the following:
identifying rising damp, using moisture meters, controlling rising damp, interpreting information, setting up equipment,
stepped drilling procedures, types of damp-proof treatments, the importance of re-plastering, safe disposal of waste