Facebook Pixel
Skip to content

Search results

Your search for car resulted in 234 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

NHSS 12B Lead Traffic Management Operative (LTMO)

The purpose of this standard is to cover 12A/B for static temporary traffic management on motorways and high speed dual carriageways including on-line widening schemes, to the level of Lead Traffic Management Operative.

NHSS 12C General Operative Training

The purpose of this standard is to cover 12C scheme for mobile lane closure (MLC) Traffic Management on motorways and other dual carriageways, to the level of a mobile lane closure operative (advance sign vehicle driver).

NHSS 12C Supervisor

The purpose of this standard is to cover 12C scheme for mobile lane closure Traffic Management on motorways and other dual carriageways, to the level of a mobile lane closure Supervisor (Block vehicle driver).

NHSS 12D M1 Mobile Works on Single Carriageways


NHSS 12D M2 Static Works on Single Carriageways


NHSS 12D M3 Static Works on Low Speed Dual Carriageways

Training covers: quality assurance; national Highway Sector Schemes; health & Safety; risk assessments/method statements; industry; guidance documents; chapter 8 of the traffic signs manual; types of work; safety zones; equipment and vehicles; basic layouts; maintaining closures; setting out traffic management; arrival on site; advance signs; taper installation; entering closures; removal of closures; safe taper positions; non-motorised road users; roundabouts.

NHSS Impact Protection Vehicle

The purpose of this standard is to cover 12A/B scheme for static temporary traffic management on motorways and high speed dual carriageways including on-line widening schemes. It is aimed at anyone who works on high speed roads, running mobile hard shoulder (or non-live lane) operations using an IPV and for protecting and installing static temporary traffic management.

On track plant attachments - Cable Drum Carrier


On track plant attachments - Scarifier


Overhead travelling crane theory test

Full details of this standard will be published shortly.