- Published
- Roofing (slating and tiling)
- Assured
- £140 (Tier 2)
- GET2357
The purpose of this standard is to provide the candidate with the knowledge and skills to install interlocking tiles for a new roof, including the: membrane, battens, main tiles, ridge tiles, hip tiles, verge tiles, valley tiles, fittings, and flashings.
- Published
- Roofing (liquid)
- Assured
- £60 (Tier 1)
- GET1830
This title was previously known as: Introduction to liquid roofing (eLearning). The purpose of this standard is to provide the candidate with introductory knowledge to liquid roofing.
- Published
- Painting and decorating
- Assured
- £30 (Tier 1 - refresher)
- GET3203
The purpose of the Introduction to marbling techniques - refresher standard is for delegates who have previously passed training to the Introduction to marbling techniques standard or subsequent refresher training and can provide proof of attendance.
- Published
- Painting and decorating
- Assured
- £70 (Tier 2 - refresher)
- GET3204
The purpose of the Introduction to paperhanging - refresher standard is for delegates who have previously passed training to the introduction to paperhanging standard or subsequent refresher training and can provide proof of attendance.
- Published
- Painting and decorating
- Assured
- £30 (Tier 1 - refresher)
- GET3205
The purpose of the Introduction to spray painting using HVLP equipment - refresher standard is for delegates who have previously passed training to the Introduction to spray painting using HVLP equipment standard or subsequent refresher training and can provide proof of attendance.
- Published
- Roofing (metal)
- Assured
- £140 (Tier 2)
- GET3309
The purpose of this standard is to provide delegates with an introduction to basic lead sheet bossing.
- Published
- Roofing (metal)
- Assured
- £140 (Tier 2)
- GET3310
The purpose of this standard is to provide delegates with the knowledge and skills to install batten roll roofing.
- Published
- Roofing (metal)
- Assured
- £240 (Tier 3)
- GET3301
The purpose of this standard is to provide the delegate with the knowledge to support the following:
• understanding of the Code Of Practice Design Recommendations.
• correct use of welding equipment.
• how to fabricate substrate of Dormer with underlay and wood rolls.
• understand the ventilation pathways and details.
• correct use of tools to fabricate & install gutter front apron with dormer cheeks and upstand flashings.
• how to fabricate & install dormer cheeks with front jamb, revel and head coverings.
• understand types of dormer roof and associated drainage.
• how to Install dormer cover using central wood roll, rear upstand to tiled/slated roof with fixed welted edge down stand.
• correct way to recycle waste materials
- Published
- Roofing (metal)
- Assured
- £240 (Tier 3)
- GET3302
The purpose of this standard is to provide the delegate with the knowledge to support the following:
understanding of the Code Of Practice Design Recommendations, correct use of welding equipment. how to fabricate & install flashing components using welding and bossing techniques. how to fabricate & install a chimney penetration through a slated/tiled pitched roof. understanding the suitability of flashing fixing methods in masonry. correct way to recycle waste materials.