Facebook Pixel
Skip to content

Search results

Your search for All resulted in 363 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Interlocking tiles introduction

The purpose of this standard is to provide the candidate with the knowledge and skills to install interlocking tiles for a new roof, including: battens, ridge tiles, and verge tiles.

Interlocking tiling

The purpose of this standard is to provide the candidate with the knowledge and skills to install interlocking tiles for a new roof, including the: membrane, battens, main tiles, ridge tiles, hip tiles, verge tiles, valley tiles, fittings, and flashings.

Internal ceramic tiling to sheet and board substrates

The purpose of this standard is to provide the candidate with the knowledge and skills to tile internally onto overlay sheet and board substrates on walls and floors.

Internal fixing of cavity drainage membranes

The purpose of this standard is to provide the delegate with the knowledge and skills to support the following: recognising when a remedial DPC is unsuitable, preparing wall surfaces, isolating electrical circuits on walls, fixing cavity drainage plaster membranes

Internal wall insulation Dryliner TL

This training standard is being withdrawn and grant is no longer available for achievements from 17/04/2024

Internal wall insulation RF

This training standard is being withdrawn and grant is no longer available for achievements from 17/04/2024

Internal wall insulation: GypLyner IWL

This training standard is being withdrawn and grant is no longer available for achievements from 17/04/2024

Internal wall insulation: GypLyner Universal

This training standard is being withdrawn and grant is no longer available for achievements from 17/04/2024

Introduction to drylining (tacker/boarder)

The purpose of this standard is to provide the delegate with the knowledge and/or skills to support the following: Scope: hazards, risk assessment and safe systems of work, installing plasterboard to metal frames, timber frames and by direct bond to maintain designed acoustic, thermal and fire performance, working to construction and manufacturers drawings, related products (e.g., plasterboards, fixings, sealants, components, adhesives, metal studs etc.) required tools and equipment

Introduction to setting out and installation of lay in grid systems

This standard is in development and will be published shortly.

How did we do today? Give feedback