Facebook Pixel
Skip to content

Search results

Your search for principle resulted in 30 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Flint working introduction

The purpose of this standard is to provide the learner with the knowledge and skills to support the following scope: This module will provide an introduction to flint in the context of historic and modern construction. It covers material selection, and the core principles of flintwork relevant to maintenance, conservation and new construction.

Health and safety for construction directors - SSP

This standard is exclusively used for the Site Safety Plus (SSP) health and safety courses. The purpose of this standard is to provide a training opportunity for directors to evaluate, analyse and explore principles and practices for leading health and safety at work within the built environment. This standard is also known as: Director's Role for Health and Safety (DRHS); Leading Health and Safety at Work.

Health and safety in construction site supervision

The purpose of training delivered against this standard is to provide site supervisors the opportunity to analyse, evaluate and explore principles and practices for supervising health and safety at work within the built environment.

Health and safety in construction site supervision - SSP

This standard is exclusively used for the Site Safety Plus (SSP) health and safety courses. If you are looking for a similar standard to use against other courses, please use the generic Health and Safety in Construction Site Supervision standard. The purpose of this standard is to provide a training opportunity for site supervisors to analyse, evaluate and explore principles and practices for supervising health and safety at work within the built environment. This standard is also known as Site Supervisor Safety Training Scheme (SSSTS).

Installation of plasterboard by direct bond (dot & dab)

The purpose of this standard is to provide the delegate with the knowledge and/or skills to support the following scope: hazards, risk assessment and safe systems of work, installation of plasterboard by direct bond to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g., plasterboards, fixings, sealants, components, adhesives etc.) required tools and equipment

Laser scanning for construction surveying

The purpose of this standard is to provide the delegate with the knowledge to support the following: the principles and practices of laser scanning for use in construction specific contexts and covers the practical elements, relevant theory, use of software and considerations when working in a public area.

Levelling and tape measurement

This standard covers the principles of levelling and setting out by tape which can be applied to all aspects of construction including earthworks, roads, buildings, foundations, piles, structural steel, structures, reinforced concrete, and houses.

Machine control for machine operators

The purpose of this standard is to understand the principles and practices of using machine control for any aspect of groundworks and road construction. It is aimed at machine operators who are required to work with machine control equipment.

Machine control for site engineers

The purpose of this standard is to understand the principles and practices of using machine control for any aspect of groundwork's and road construction.

Metal Framed Wall-Lining Systems Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of metal wall-linings to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g. plasterboards, fixings, sealants, components, etc.) required tools and equipment

How did we do today? Give feedback