- Published
- Concrete
- Assured
- £140 (Tier 2)
- GET2916
The purpose of this standard is to provide the delegate with the knowledge to support in managing/supervising screen activities.
- In development
- Plant maintenance
- Assured
- £60 (Tier 1)
- GET1706
This training standard is in development and will be published shortly.
- In development
- Plant maintenance
- Assured
- £140 (Tier 2)
- GET1709
This training standard is in development and will be published shortly.
- In development
- Plant maintenance
- Assured
- £140 (Tier 2)
- GET1712
This training standard is in development and will be published shortly.
- In development
- Plant maintenance
- Assured
- £240 (Tier 3)
- GET1715
This training standard is in development and will be published shortly.
- Published
- Façade preservation
- Assured
- £60 (Tier 1)
- GET2116
The purpose of this standard is to provide the candidate with the knowledge and skills to point and joint for façade preservation work.
- Published
- Working at height
- Recognised
- £120 (Tier 3 – refresher)
- GET0239
This standard covers the training requirements for an operative to maintain and refresh their skills and knowledge to correctly and safely erect and dismantle different types of scaffold. This training standard was previously held under the occupational area Scaffolding.
- Published
- Roofing (single ply)
- Assured
- £140 (Tier 2)
- GET1774
The purpose of this standard is to provide the candidate with advanced knowledge and skills in single ply roofing.
- Published
- Roofing (metal)
- Assured
- £240 (Tier 3)
- GET3305
The purpose of this standard is to provide the delegate with the knowledge to support the following:
understanding of the Code of Practice Design Recommendations. correct use of welding equipment.
correct use of equipment to fabricate and install decorative sheet roofing. how to prepare Spire or Dome with underlay including joints & panels. how to install herringbone pattern with hollow rolls. how to install herringbone pattern with wood cored rolls. how to install welt joints & fixings. how to install hollow rolls, wood core rolls & welted joints to barrel vaulted roof with ridge & hip details. correct way to fabricate rainwater pipe & box hopper. preparing patterns before casting. Understanding of the regulations when working on heritage buildings or within conservation areas. lead casting simple embellishments using sand box technique. correct way to recycle waste materials.
- Published
- Plant hire and sales
- Assured
- £60 (Tier 1)
- GET2583
To be able to provide the best advice and demonstration of product as to suitability to customers' requirements for particular job to secure the hire business.