Facebook Pixel
Skip to content

Search results

Your search for The resulted in 959 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Install, inspect and remove timber and steel support systems

The purpose of this standard is to provide the delegate with the knowledge to support the following: plan to install timber and steel support systems; prepare to install and remove timber and steel support systems; install and remove timber and steel support systems; inspect timber and steel support systems.

Install, inspect and remove timber support systems

This is one of the standards held by the Energy & Utility Skills Register

Install, inspect and remove timber support systems refresher

The purpose of Install, inspect and remove timber support systems refresher course is for delegates who have previously passed the full install, inspect and remove timber support systems course or subsequent refresher course and can provide proof of attendance.

Install, inspect and remove timber, steel and proprietary support systems

This is one of the standards held by the Energy & Utility Skills Register

Install, inspect, and remove steel and proprietary support systems

The purpose of this standard is to provide the delegate with the knowledge to support the following: plan to install steel and proprietary support systems; prepare to install and remove steel and proprietary support systems; install and remove steel and proprietary support systems; inspect steel and proprietary support systems.

Installation of fire door assemblies and door sets

The purpose of training delivered against this standard is to provide candidates with knowledge covering the installation requirements for timber fire door assemblies and door sets.

Installation of linear joint and cavity barriers (open state and full fill) seals

The purpose of this standard is to provide the delegate with the knowledge to support the following: the role of compartment walls and floors; understanding how linear joint seals and cavity barriers (full fill and open state) work and their place in the wider passive fire protection system; legislation and guidance associated with firestopping linear joint seals and cavity barriers in compartment walls and floors; considerations to make before selecting a fit for purpose firestop seal, in terms of fire resistance and other salient properties such as durability, acoustic, air tightness and structural movement requirements; considerations when installing generic types of linear joint seals and cavity barriers (full fill and open state); considerations on completion of the installation of firestop seals.

Installation of linear joint and cavity barriers (open state and full fill) seals refresher

The purpose of Installation of linear joint and cavity barriers (open state and full fill) seals refresher course is for delegates who have previously passed the Installation of linear joint and cavity barriers (open state and full fill) seals course or subsequent refresher course and can provide proof of attendance.

Installation of plasterboard by direct bond (dot & dab)

The purpose of this standard is to provide the delegate with the knowledge and/or skills to support the following scope: hazards, risk assessment and safe systems of work, installation of plasterboard by direct bond to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g., plasterboards, fixings, sealants, components, adhesives etc.) required tools and equipment

Installation of roof lights to all roofs

The purpose of this standard is to provide the candidate with knowledge and skills to install a rooflight (also known as skylight) to a roof.

How did we do today? Give feedback