Facebook Pixel
Skip to content

Search results

Found 1369 short duration training standards. The standards are sorted in alphabetical order

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Asbestos non-licensed supervisor/manager

This standard covers the theoretical and practical skills needed to undertake non-licensed work with asbestos Including NNLW as defined in the approved code of practice (ACoP), currently L143 Second Edition, Regulation 10 - Training for non-licensable work.

Asbestos surveying and sampling strategies

The aim of this training is to provide background and practical knowledge in the surveying of buildings for asbestos, and to provide general guidance on management procedures necessary to minimise exposure to any identified asbestos.

ATTMA Air tightness testing - Level 1

This 4-day course provides both the knowledge and understanding required to air tightness test single dwellings and other small simple buildings.

ATTMA Air tightness testing - Level 2

This 3-day course provides both the knowledge and understanding required to air tightness test simple and non-simple buildings except those defined as: Large buildings with an envelope area over 80,000 m2; High rise buildings with more than 15 storeys; Phased or zonal handover buildings

ATTMA Envelope area 3D modelling - Advanced

This 1 day course provides both the knowledge and understanding required to model complex envelope areas and volumes in 3D using the SketchUp software.

ATTMA Envelope area 3D modelling - Beginner

This 1 day course provides both the knowledge and understanding required to model envelope areas and volumes in 3D using the SketchUp software.

Avoiding construction errors at interfaces - Part one: Collaboration - Trainer Training


Avoiding construction errors at interfaces - Part one: Collaboration (Delivery Phase)


Avoiding construction errors at interfaces - Part one: Collaboration (Development Phase)


Avoiding construction errors at interfaces - Part two: Designing for construction


How did we do today? Give feedback