Facebook Pixel
Skip to content

Search results

Your search for sign resulted in 87 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Production and use of multi-plate stencils

This standard is about producing multi-plate stencils from complex designs to include setting out and application.

Project Management in Construction Introduction

The purpose of this standard is to provide entry-level introduction to construction project management which will introduce basic concepts and practices and signpost possible directions for further development.

Safe Excavation Techniques in Construction

The purpose of this standard is to provide the delegate with the knowledge to support the following: Scope: • spoil characteristics safe storage and removal of excavated material • maintain a safe environment • maintain tools and equipment • underground and above ground services • permits to work • working at height near excavations • safety signs and signals • emergency procedures • banksman role and responsibilities • transportation of loads • hazards – all common plant and plant machinery • hazards – collapse, noise, environmental and services • legislation, regulations and approved guidance • topsoil and subsoil characteristics • proprietary trench support • marking out and measuring • the effects of adverse weather conditions

Scaffolding Estimator

The purpose of this standard is to provide the delegate with the knowledge to support the following: Scope: identify customer requirements, various estimating formulae, site hazards plus cost implications, on-site measuring, use design drawings, measure drawings, produce quotations, contract quotation letters, day work costing, computer-based estimating and contract administration, estimating projects

Shaftwall Systems

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, T junctions, internal and external corners, door openings, firestop plasterboard joints and service openings, and more.

Slinger/signaller: all types, all duties (experienced)

This standard is exclusively for use by Approved Training Organisations (ATOs). The purpose and scope of this standard is to provide the delegate with the skills and knowledge to support the Slinger/signaller: all types, all duties (experienced)

Slinger/signaller: all types, all duties (novice)

This standard is exclusively for use by Approved Training Organisations (ATOs). The purpose and scope of this standard is to provide the delegate with the skills and knowledge to support the operation of Slinger/signaller: all types, all duties (novice).

Slinger/signaller: all types, static duties practical test

Full details for this standard will be published shortly

Slinger/signaller: all types, static duties training

Full details of this standard will be published shortly

Slinger/signaller: excavator only practical test

Full details of this standard will be published shortly.

How did we do today? Give feedback