- Published
- Road building and repair
- Recognised
- £60 (Tier 1)
- GET1385
This standard provides the basic knowledge for 12A/B for static temporary traffic management on motorways and high speed dual carriageways including on-line widening schemes.
- Published
- Road building and repair
- Recognised
- £60 (Tier 1)
- GET2686
This training standard is in development and will be published shortly.
- Published
- Road building and repair
- Recognised
- £60 (Tier 1)
- GET1386
The purpose of this standard is to cover 12a/b for static temporary traffic management on motorways and high speed dual carriageways including on-line widening schemes, to the level of Traffic Safety and Control Officer (TSCO).
- Published
- Road building and repair
- Recognised
- £60 (Tier 1)
- GET1381
The purpose of this standard is to cover 12A/B for static temporary traffic management on motorways and high speed dual carriageways including on-line widening schemes, to the level of Lead Traffic Management Operative.
- Published
- Road building and repair
- Recognised
- £140 (Tier 2)
- GET1387
The purpose of this standard is to cover 12C scheme for mobile lane closure (MLC) Traffic Management on motorways and other dual carriageways, to the level of a mobile lane closure operative (advance sign vehicle driver).
- Published
- Road building and repair
- Recognised
- £140 (Tier 2)
- GET1388
The purpose of this standard is to cover 12C scheme for mobile lane closure Traffic Management on motorways and other dual carriageways, to the level of a mobile lane closure Supervisor (Block vehicle driver).
- Published
- Road building and repair
- Recognised
- £70 (Tier 2 - refresher)
- GET1389
The purpose of this standard is to provide a refresher on 12C scheme for mobile lane closure Traffic Management on motorways and other dual carriageways.
- Published
- Road building and repair
- Recognised
- £60 (Tier 1)
- GET3037
Training covers: quality assurance; national Highway Sector Schemes; health & Safety; risk assessments/method statements; industry; guidance documents; chapter 8 of the traffic signs manual; types of work; safety zones; equipment and vehicles; basic layouts; maintaining closures; setting out traffic management; arrival on site; advance signs; taper installation; entering closures; removal of closures; safe taper positions; non-motorised road users; roundabouts.